If you've ever been to Western Kentucky University, you know Cherry Hall. It sits at the top of the Hill in Bowling Green and is one of the most recognizable buildings on campus. So when we were called to help get new HVAC and cooling equipment up onto its rooftop penthouses, we knew the job called for precision, planning, and the right machine.
The scope was straightforward on paper: fly HVAC and cooling equipment up and set it into the openings of Cherry Hall's East and West penthouses. In practice, working on a busy college campus around a historic building means tight access, careful setup, and zero room for error.
For this lift we brought out our XCMG XCT40U, a 40-ton crane that gave us the reach and capacity to place each unit right where it needed to go. Its compact footprint made it a great fit for setting up on campus, while still delivering the lifting power to handle the equipment safely.
Getting the equipment to the penthouse was only half the job. Once each piece was set in the penthouse openings, the crew from Tri-State Rigging took over, moving and skating the equipment into its final position inside. That hand-off between our crane operation and their rigging team kept the project moving smoothly from ground to rooftop to final placement.
Jobs like this are a great reminder that the best results come from good partners. A big thank-you to Tri-State Rigging and everyone at WKU who helped make this lift a success.